Scaffolding and underside shoring become unnecessary as does the need for any removal of wood forms.
Stay in place concrete bridge deck forms.
Uniform slab depth can be more easily achieved and the waiting period needed to remove wood forms after the concrete has set is eliminated.
Suitable for new bridge construction and rehabilitation bridge dek stay in place deck forming systems offer your project ease and speed of construction safety durability and longevity.
Transparent stay in place form technology truetech bridge is a national provider of engineered bridge systems for the heavy highway industry.
Bridge dek is made of high strength galvanized steel to meet design requirements of steel and concrete bridge structures.
Stay form is the most cost effective solution for forming bulkheads tunnels or any below grade structure.
Our clearcast form system eliminates the time and risk of stripping removable forms while enabling inspection for the life of the bridge deck.
The unit working stress in the steel will not be more than 0 725 of the specified minimum yield strength of the material furnished but not to exceed 250 mpa.
Stay in place metal bridge forms.
Figure 2 1 1 typical deck form support for a concrete box girder bridge 2 1 figure 2 1 2 typical deck sheathing supports on a concrete box girder bridge 2 2 figure 2 1 3 stay in place metal forming on a precast girder bridge 2 3 figure 2 1 4 example of a slab bridge 2 4 figure 2 1 5 example of a steel girder bridge 2 4.
Our transparent stay in place deck forming system is the result of years of research and development yielding an innovative method of bridge deck construction that improves productivity and safety while complying with bridge owner inspection criteria.
The metal bridge forms are designed on the basis of dead load of form plus wet weight of reinforced concrete at 240 kg m3 150 pcf plus 2 4 kpa 50 lb sq ft for construction loads.
Visit us today and view our stay in place steel bridge forms solutions.
Bridge form and highway products.
The clearcast forms difference.
Ends of corrugations are factory closed or crimped to prevent leakage of concrete.
Stay form is easy to cut when forming construction joints keyways and curved shapes saving valuable time.
Foster s bridge products include.
Using stay in place forms can greatly reduce both the cost and time of forming bridge deck slabs.
Are slightly different than what was shown on the as built drawings and additional material is required after the bridge deck has already been removed with a timeline for construction.
At d mac industries we provide you with same day steel deck solution so that you can week your project moving.